A novel construction scheduling framework for a mixed construction process of precast components and cast-in-place parts in prefabricated buildings
Auteur(s): |
Bin Yang
Boda Liu Jianzhuang Xiao Binghan Zhang Zhichen Wang Miaosi Dong |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Building Engineering, novembre 2021, v. 43 |
Page(s): | 103181 |
DOI: | 10.1016/j.jobe.2021.103181 |
- Informations
sur cette fiche - Reference-ID
10628178 - Publié(e) le:
05.09.2021 - Modifié(e) le:
05.09.2021