0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

New Vienna-St. Pölten Railway Line, Perschling Tunnels – Design and preparatory works for the combination of TBM, NATM and cut-and-cover construction methods

Author(s):



Medium: journal article
Language(s): English
Published in: Felsbau, , n. 2, v. 25
Page(s): 18
Keywords:
railway construction TBM drive

Structures and Projects

Structure Types

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10064584
  • Published on:
    21/03/2011
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine