0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

New Time-Cost Trade-Off Model Considering the Sequence of Alternatives Between Activities

Author(s):


Medium: journal article
Language(s): English
Published in: Journal of Asian Architecture and Building Engineering, , n. 2, v. 14
Page(s): 379-386
DOI: 10.3130/jaabe.14.379
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3130/jaabe.14.379.
  • About this
    data sheet
  • Reference-ID
    10331209
  • Published on:
    29/07/2019
  • Last updated on:
    29/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine