- (2024): Efficiency Comparison between Simplified and Advanced Evacuation Analysis Models: A Case Study of Guryong Station, Republic of Korea. In: Buildings, v. 14, n. 9 (25 August 2024).
- (2024): Development of a Tabletop Hologram for Spatial Visualization: Application in the Field of Architectural and Urban Design. In: Buildings, v. 14, n. 7 (2 July 2024).
- New Time-Cost Trade-Off Model Considering the Sequence of Alternatives Between Activities. In: Journal of Asian Architecture and Building Engineering, v. 14, n. 2 (May 2015). (2015):
- A System Model for Analyzing and Accumulating Construction Work Crew′s Productivity Data Using Image Processing Technologies. In: Journal of Asian Architecture and Building Engineering, v. 13, n. 3 (September 2014). (2014):
- Quantified Comparison and Analysis of Different Productivity Measurements. In: Journal of Asian Architecture and Building Engineering, v. 7, n. 2 (November 2008). (2008):
- Developing a Process Model for Optimizing Linear Process Plans Based on Three Types of Buffers and Brute-Force Algorithm. In: Journal of Asian Architecture and Building Engineering, v. 15, n. 2 (May 2016). (2016):