0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The New Semmering Base Tunnel - project overview / Der Semmering-Basistunnel neu - das Projekt im Überblick

Author(s):
Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 6, v. 6
Page(s): 680-687
DOI: 10.1002/geot.201310022
Abstract:

The New Semmering Base Tunnel (SBTn) has been designed with a flat gradient to meet the requirement for uniform high-speed rail infrastructure for the new Südbahn line, which is considered an internationally significant transport corridor for Austria as an industrial location. The 27.3 km tunnel is divided into a number of construction sections with separate contracts due to the geological and hydrogeological conditions. In addition to the tunnel drives from the Gloggnitz portal, the tunnel will also be driven from three intermediate starting points. The individual tunnelling contracts will be started at intervals of about one year. The first tunnelling contract starts in 2014 in the Fröschnitzgraben, the drives in Gloggnitz and the intermediate starting point at Göstritz in 2015 and the tunnel drive in Grautschenhof from 2016. From 2021, when all tunnelling works have been completed and the structure of the two running tunnels has been completed, the installation of the tunnel equipment will start. Opening for service is intended for the end of 2014.

Keywords:
approval procedures official approval process selection of tunnelling methods
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201310022.
  • About this
    data sheet
  • Reference-ID
    10069550
  • Published on:
    15/12/2013
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine