The New Semmering Base Tunnel project - an interdisciplinary challenge / Das Projekt Semmering-Basistunnel neu - Eine interdisziplinäre Herausforderung
Author(s): |
G. Gobiet
D. Haas |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2010, n. 2, v. 3 |
Page(s): | 110-118 |
DOI: | 10.1002/geot.201000009 |
Abstract: |
After receiving the commission to develop a New Semmering Base Tunnel in early 2005, the ÖBB-Infrastruktur (Bau) AG (Austrian Railways) undertook a three-year route selection process leading to the determination of the Pfaffensattel route as the best variant for the New Semmering Base Tunnel. Extensive design work on this route is underway at the moment in all disciplines. The aim is to produce the documentation to hand in for official approval by the early part of this year, and this should show a wide understanding and agreement of all project parties as well as technical quality. |
Keywords: |
drilling programme route selection construction concepts set-up areas intermediate starting points intermediate accesses
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10063777 - Published on:
19/11/2010 - Last updated on:
13/08/2014