Die neue Ruhrbrücke in Wetter - Eine Stahlverbundbrücke mit luftdicht verschweißten Kästen
Author(s): |
Stefan Hagedorn
Winfried Neumann Christoph Schmitz Karl-Josef Siebers Ulrich Weyer |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, February 2011, n. 2, v. 80 |
Page(s): | 67-80 |
DOI: | 10.1002/stab.201001401 |
Abstract: |
The new Ruhr Bridge in Wetter, Germany - An air-proof welded steel box girders.From May 2008 to December 2010 a new bridge over the Ruhr River was built in Wetter in Germany. The exposed location of the bridge over the Ruhr valley close to the city of Wetter requires a deliberate designed structure. Within the preliminary plannings, comprehensive studies about reasonable bridge construction systems were carried out, supported by an architecture office. Planned and realised has been a 361 m long bridge with air-proof welded steel box girders and a concrete deck. The maximum span is nearly 84 m and the inclined haunch above the pier is about 9 m high. The inclined haunch has been formed with two diagonal struts to dissolve the construction. In the area of the vertical structured piers outside the Ruhr the bridge superstructure has been constructed with parallel chords. |
Keywords: |
building execution deck bridge haunch parallel chords
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10064010 - Published on:
11/02/2011 - Last updated on:
13/08/2014