Neue baubetriebswirtschaftliche Verfahren zur Ermittlung der Höhe der AGK bei Mehrvergütungsansprüchen nach § 2 Abs. 5 und 6 sowie § 6 Abs. 6 VOB/B - Teil 1
Author(s): |
Ivan C̆adez̆
|
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, March 2015, n. 3, v. 92 |
Page(s): | 196-200 |
DOI: | 10.1002/bate.201400101 |
Abstract: |
New estimation methods for the determination of general costs at claim requests according to § 2 clause 5 and 6 as well as § 6 clause 6 VOB/BParticularly in claim disputes concerning delay in construction time caused by the client based on the V0B/B there is no consistent opinion concerning the consideration of the appropriate amount of general costs in the claims; mainly because this issue is quite complex with legal, cost theoretical and construction business management characteristics to be considered. |
Keywords: |
general costs delay in construction manufacturing costs/construction time method capacity utilization method construction work related method construction time related method
|
Available from: | Refer to publisher |