Monitoring and Controlling on Surface Settlement in Sand and Gravel Strata Caused by Subway Station Construction Applying Pipe-roof Pre-construction Method (ppm)
Author(s): |
Xian Yang
Yang Liu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Stavební obzor - Civil Engineering Journal, 2017, n. 2, v. 26 |
Page(s): | 179-188 |
DOI: | 10.14311/cej.2017.02.0016 |
- About this
data sheet - Reference-ID
10603767 - Published on:
23/04/2021 - Last updated on:
23/04/2021