Monitoring and Controlling on Surface Settlement in Sand and Gravel Strata Caused by Subway Station Construction Applying Pipe-roof Pre-construction Method (ppm)
Auteur(s): |
Xian Yang
Yang Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Stavební obzor - Civil Engineering Journal, 2017, n. 2, v. 26 |
Page(s): | 179-188 |
DOI: | 10.14311/cej.2017.02.0016 |
- Informations
sur cette fiche - Reference-ID
10603767 - Publié(e) le:
23.04.2021 - Modifié(e) le:
23.04.2021