Modelling the magnitude of plant downtime: a tool for improving plant operations management
Author(s): |
David J. Edwards
Silas Yisa |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, March 2001, n. 3, v. 8 |
Page(s): | 225-232 |
DOI: | 10.1108/eb021184 |
- About this
data sheet - Reference-ID
10575804 - Published on:
26/02/2021 - Last updated on:
26/02/2021