Modelling the magnitude of plant downtime: a tool for improving plant operations management
Auteur(s): |
David J. Edwards
Silas Yisa |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, mars 2001, n. 3, v. 8 |
Page(s): | 225-232 |
DOI: | 10.1108/eb021184 |
- Informations
sur cette fiche - Reference-ID
10575804 - Publié(e) le:
26.02.2021 - Modifié(e) le:
26.02.2021