0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modeling the Interdependencies between the Risk Factors Contributing to Preconstruction Delays in Construction Projects

This publication lists 77 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10818590
  • Published on:
    12/03/2025
  • Last updated on:
    12/03/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine