0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modeling the Interdependencies between the Risk Factors Contributing to Preconstruction Delays in Construction Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jcemd4.coeng-15871.
  • About this
    data sheet
  • Reference-ID
    10818590
  • Published on:
    12/03/2025
  • Last updated on:
    12/03/2025
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine