0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction

This publication lists 21 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10165905
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine