0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction

This publication has been cited in the following 43 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10165905
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine