A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
Author(s): |
Rogier Jongeling
Thomas Olofsson |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, March 2007, n. 2, v. 16 |
Page(s): | 189-198 |
DOI: | 10.1016/j.autcon.2006.04.001 |
- About this
data sheet - Reference-ID
10189002 - Published on:
10/12/2018 - Last updated on:
10/12/2018