A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
Auteur(s): |
Rogier Jongeling
Thomas Olofsson |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, mars 2007, n. 2, v. 16 |
Page(s): | 189-198 |
DOI: | 10.1016/j.autcon.2006.04.001 |
- Informations
sur cette fiche - Reference-ID
10189002 - Publié(e) le:
10.12.2018 - Modifié(e) le:
10.12.2018