A Method for Calculating Cost Correlation among Construction Projects in a Portfolio a Portfolio
Author(s): |
Payam Bakhshi
Ali Touran |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | International Journal of Architecture Engineering and Construction, September 2012, n. 3, v. 1 |
Page(s): | 134-141 |
DOI: | 10.7492/ijaec.2012.015 |
- About this
data sheet - Reference-ID
10378223 - Published on:
10/11/2019 - Last updated on:
10/11/2019