  1. Gao, Nan / Touran, Ali / Wang, Qi / Beauchamp, Nicholas (2024): Construction risk identification using a multi-sentence context-aware method. In: Automation in Construction, v. 164 (August 2024).

    https://doi.org/10.1016/j.autcon.2024.105466

  2. Yin, Yangtian / Choi, Kunhee / David Jeong, H. / Touran, Ali (2022): Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times. In: Journal of Management in Engineering (ASCE), v. 38, n. 6 (November 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001089

  3. Touran, Ali (1990): Expert System for Compactor Selection. In: Journal of Transportation Engineering, v. 116, n. 3 (May 1990).

    https://doi.org/10.1061/(asce)0733-947x(1990)116:3(338)

  4. Barutha, Philip J. / David Jeong, H. / Gransberg, Douglas D. / Touran, Ali (2021): Evaluation of the Impact of Collaboration and Integration on Performance of Industrial Projects. In: Journal of Management in Engineering (ASCE), v. 37, n. 4 (July 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000921

  5. Gao, Nan / Touran, Ali (2020): Cost Overruns and Formal Risk Assessment Program in US Rail Transit Projects. In: Journal of Construction Engineering and Management, v. 146, n. 5 (May 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001827

  6. Bakhshi, Payam / Touran, Ali (2012): A Method for Calculating Cost Correlation among Construction Projects in a Portfolio a Portfolio. In: International Journal of Architecture Engineering and Construction, v. 1, n. 3 (September 2012).

    https://doi.org/10.7492/ijaec.2012.015

  7. Gurgun, Asli Pelin / Touran, Ali (2014): Public-Private Partnership Experience in the International Arena: Case of Turkey. In: Journal of Management in Engineering (ASCE), v. 30, n. 6 (November 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000213

  8. Touran, Ali / Gransberg, Douglas D. / Molenaar, Keith R. / Ghavamifar, Kamran (2011): Selection of Project Delivery Method in Transit: Drivers and Objectives. In: Journal of Management in Engineering (ASCE), v. 27, n. 1 (January 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000027

  9. Ghavamifar, Kamran / Touran, Ali (2009): Owner’s Risks versus Control in Transit Projects. In: Journal of Management in Engineering (ASCE), v. 25, n. 4 (October 2009).

    https://doi.org/10.1061/(asce)0742-597x(2009)25:4(230)

  10. Hurley, Michael W. / Touran, Ali (2002): Cost Structure and Profitability of Design Services Industry. In: Journal of Management in Engineering (ASCE), v. 18, n. 4 (October 2002).

    https://doi.org/10.1061/(asce)0742-597x(2002)18:4(167)

  11. Gurgun, Asli Pelin / Zhang, Ye / Touran, Ali (2013): Schedule Contingency Analysis for Transit Projects Using A Simulation Approach. In: Journal of Civil Engineering and Management, v. 19, n. 4 (September 2013).

    https://doi.org/10.3846/13923730.2013.768542

  12. Ghavamifar, Kamran / Touran, Ali (2008): Alternative Project Delivery Systems: Applications and Legal Limits in Transportation Projects. In: Journal of Professional Issues in Engineering Education and Practice, v. 134, n. 1 (January 2008).

    https://doi.org/10.1061/(asce)1052-3928(2008)134:1(106)

  13. Gilly, Bruno A. / Touran, Ali / Asai, Toshiyuki (1987): Quality Control Circles in Construction. In: Journal of Construction Engineering and Management, v. 113, n. 3 (September 1987).

    https://doi.org/10.1061/(asce)0733-9364(1987)113:3(427)

  14. Touran, Ali (1990): Integration of Simulation with Expert Systems. In: Journal of Construction Engineering and Management, v. 116, n. 3 (September 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:3(480)

  15. Touran, Ali / Ladick, Dennis R. (1989): Application of Robotics in Bridge Deck Fabrication. In: Journal of Construction Engineering and Management, v. 115, n. 1 (March 1989).

    https://doi.org/10.1061/(asce)0733-9364(1989)115:1(35)

  16. Touran, Ali / Wiser, Edward P. (1992): Monte Carlo Technique with Correlated Random Variables. In: Journal of Construction Engineering and Management, v. 118, n. 2 (June 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:2(258)

  17. Touran, Ali (1991): Modeling Uncertainty in Operations with Nonstationary Cycle Times. In: Journal of Construction Engineering and Management, v. 117, n. 4 (December 1991).

    https://doi.org/10.1061/(asce)0733-9364(1991)117:4(728)

  18. Touran, Ali (1993): Probabilistic Cost Estimating with Subjective Correlations. In: Journal of Construction Engineering and Management, v. 119, n. 1 (March 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:1(58)

  19. Touran, Ali / Atgun, Metin / Bhurisith, Ittiphol (2004): Analysis of the United States Department of Transportation Prompt Pay Provisions. In: Journal of Construction Engineering and Management, v. 130, n. 5 (October 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:5(719)

  20. Touran, Ali / Suphot, Lerdwuthirong (1997): Rank Correlations In Simulating Construction Costs. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:3(297)

  21. Touran, Ali (2003): Probabilistic Model for Cost Contingency. In: Journal of Construction Engineering and Management, v. 129, n. 3 (June 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:3(280)

  22. Bahrami, Shahin / Touran, Ali (1998): A Probabilistic Approach For Estimating Tunneling Duration. In: Civil Engineering and Environmental Systems, v. 15, n. 2 (March 1998).

    https://doi.org/10.1080/02630259808970236

  23. Touran, Ali (2010): Probabilistic Approach for Budgeting in Portfolio of Projects. In: Journal of Construction Engineering and Management, v. 136, n. 3 (March 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000128

  24. Touran, Ali (1997): Probabilistic Model for Tunneling Project Using Markov Chain. In: Journal of Construction Engineering and Management, v. 123, n. 4 (December 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:4(444)

  25. Touran, Ali / Sheahan, Thomas C. / Ozcan, Emre (1997): Rational Equipment Selection Method Based on Soil Conditions. In: Journal of Construction Engineering and Management, v. 123, n. 1 (March 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:1(85)

  26. Bhurisith, Ittiphol / Touran, Ali (2002): Case Study of Obsolescence and Equipment Productivity. In: Journal of Construction Engineering and Management, v. 128, n. 4 (August 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:4(357)

  27. Touran, Ali / Lopez, Ramon (2006): Modeling Cost Escalation in Large Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 132, n. 8 (August 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:8(853)

  28. Touran, Ali (1986): Computer packages for construction data acquisition and processing. In: Construction Management and Economics, v. 4, n. 3 (December 1986).

    https://doi.org/10.1080/01446198600000018

  29. Touran, Ali / Taher, Khalid A. H. (1988): Optimum fleet size determination by queuing and simulation. In: Construction Management and Economics, v. 6, n. 4 (December 1988).

    https://doi.org/10.1080/01446198800000025

  30. Touran, Ali / Okereke, Alex (1991): Performance of Orthotropic Bridge Decks. In: Journal of Performance of Constructed Facilities (ASCE), v. 5, n. 2 (May 1991).

    https://doi.org/10.1061/(asce)0887-3828(1991)5:2(134)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine