0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong

This publication lists 48 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10174929
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine