Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong
Author(s): |
Tengfei Huo
Hong Ren Weiguang Cai Geoffrey Qiping Shen Bingsheng Liu Minglei Zhu Hengqin Wu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, March 2018, n. 3, v. 144 |
Page(s): | 05018001 |
DOI: | 10.1061/(asce)co.1943-7862.0001444 |
Geographic Locations
- About this
data sheet - Reference-ID
10174929 - Published on:
07/12/2018 - Last updated on:
07/12/2018