0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Liquidated Damages: A Comparative Study of the Law in England, Australia, New Zealand, and Singapore

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10333054
  • Published on:
    29/07/2019
  • Last updated on:
    29/07/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine