0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Liquidated Damages: A Comparative Study of the Law in England, Australia, New Zealand, and Singapore

Author(s):
Medium: journal article
Language(s): English
Published in: Journal of Professional Issues in Engineering Education and Practice, , n. 3, v. 133
Page(s): 210-217
DOI: 10.1061/(asce)1052-3928(2007)133:3(210)

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)1052-3928(2007)133:3(210).
  • About this
    data sheet
  • Reference-ID
    10333054
  • Published on:
    29/07/2019
  • Last updated on:
    29/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine