Author(s): |
Mario de Miranda
Elena Gnecchi Ruscone |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structural Engineering International, May 2010, n. 2, v. 20 |
Page(s): | 161-165 |
DOI: | 10.2749/101686610791283597 |
Abstract: |
This paper describes a bridge recently constructed in the province of Trento, Italy, which overpasses the Brennero Motorway and the Avisio River with a steel-concrete composite structure that introduces innovative features both in relation to construction system and with regard to erection methods. The A22 Motorway discussed in this paper, is traversed by a girder with a span of 120 m and a mid-span height of 2,40 m, set in place by rotation. |