An investigation of the relationship between muck geometry, TBM performance, and operational parameters: A case study in Golab II water transfer tunnel
Author(s): |
Sasan Heydari
Jafar Khademi Hamidi Masoud Monjezi Abbas Eftekhari |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, June 2019, v. 88 |
Page(s): | 73-86 |
DOI: | 10.1016/j.tust.2018.11.043 |
- About this
data sheet - Reference-ID
10310468 - Published on:
18/03/2019 - Last updated on:
18/03/2019