An investigation of the relationship between muck geometry, TBM performance, and operational parameters: A case study in Golab II water transfer tunnel
Auteur(s): |
Sasan Heydari
Jafar Khademi Hamidi Masoud Monjezi Abbas Eftekhari |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, juin 2019, v. 88 |
Page(s): | 73-86 |
DOI: | 10.1016/j.tust.2018.11.043 |
- Informations
sur cette fiche - Reference-ID
10310468 - Publié(e) le:
18.03.2019 - Modifié(e) le:
18.03.2019