Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction
Author(s): |
Taekwun Park
Moon Kyum Kim Changyoon Kim Hyoungkwan Kim |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, November 2009, n. 11, v. 135 |
Page(s): | 1261-1270 |
DOI: | 10.1061/(asce)co.1943-7862.0000101 |
- About this
data sheet - Reference-ID
10156087 - Published on:
11/12/2018 - Last updated on:
11/12/2018