Changyoon Kim
- Interactive Modeler for Construction Equipment Operation Using Augmented Reality. In: Journal of Computing in Civil Engineering, v. 26, n. 3 (May 2012). (2012):
- Object Recognition in Construction-Site Images Using 3D CAD-Based Filtering. In: Journal of Computing in Civil Engineering, v. 24, n. 1 (January 2010). (2010):
- Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project. In: Journal of Computing in Civil Engineering, v. 25, n. 1 (January 2011). (2011):
- 3D/4D CAD Applicability for Life-Cycle Facility Management. In: Journal of Computing in Civil Engineering, v. 25, n. 2 (March 2011). (2011):
- RFID and CCTV-Based Material Delivery Monitoring for Cable-Stayed Bridge Construction. In: Journal of Computing in Civil Engineering, v. 26, n. 2 (March 2012). (2012):
- Error-Correction Methods for Construction Site Image Processing under Changing Illumination Conditions. In: Journal of Computing in Civil Engineering, v. 27, n. 1 (January 2013). (2013):
- Ubiquitous Sensor Network for Construction Material Monitoring. In: Journal of Construction Engineering and Management, v. 137, n. 2 (February 2011). (2011):
- Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction. In: Journal of Construction Engineering and Management, v. 135, n. 11 (November 2009). (2009):
- Developing a technology roadmap for construction R&D through interdisciplinary research efforts. In: Automation in Construction, v. 18, n. 3 (May 2009). (2009):
- On-site construction management using mobile computing technology. In: Automation in Construction, v. 35 (November 2013). (2013):
- 4D CAD model updating using image processing-based construction progress monitoring. In: Automation in Construction, v. 35 (November 2013). (2013):