0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model

This publication lists 62 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10506511
  • Published on:
    27/11/2020
  • Last updated on:
    27/11/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine