Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
Author(s): |
Abhilasha Panwar
Kumar Neeraj Jha |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, February 2021, n. 2, v. 147 |
Page(s): | 04020160 |
DOI: | 10.1061/(asce)co.1943-7862.0001979 |
- About this
data sheet - Reference-ID
10506511 - Published on:
27/11/2020 - Last updated on:
27/11/2020