Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction
Author(s): |
Eul-Bum Lee
John T. Harvey David Thomas |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, December 2005, n. 12, v. 131 |
Page(s): | 1283-1291 |
DOI: | 10.1061/(asce)0733-9364(2005)131:12(1283) |
- About this
data sheet - Reference-ID
10161107 - Published on:
07/12/2018 - Last updated on:
07/12/2018