An integrated decision support system for building asset management based on BIM and Work Breakdown Structure
Author(s): |
Maha Al-Kasasbeh
Osama Abudayyeh Hexu Liu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Building Engineering, February 2021, v. 34 |
Page(s): | 101959 |
DOI: | 10.1016/j.jobe.2020.101959 |
- About this
data sheet - Reference-ID
10475117 - Published on:
15/11/2020 - Last updated on:
15/11/2020