An integrated decision support system for building asset management based on BIM and Work Breakdown Structure
Auteur(s): |
Maha Al-Kasasbeh
Osama Abudayyeh Hexu Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Building Engineering, février 2021, v. 34 |
Page(s): | 101959 |
DOI: | 10.1016/j.jobe.2020.101959 |
- Informations
sur cette fiche - Reference-ID
10475117 - Publié(e) le:
15.11.2020 - Modifié(e) le:
15.11.2020