0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Instrumentación del puente Fernando Reig sobre el río Barxell (1)

Author(s):

Medium: journal article
Language(s): English, Spanish
Published in: Hormigón y acero, , n. 169, v. 39
Page(s): 45-54
Abstract:

"Fernando Reig" bridge instrumentation

Thus oaoer shows the unstrymentation used in the "Fernand oReig" bridge, in Alcoy (Alicante), for monitoring its structure during the building and its subsequent load test. The "Fernando Reig" bridge is a cable stayed structure, largely built from precast concrete. It has a 90 m high central support tower and a total span of 273 m. Controls of movements, strains and temperatures were carried out. Steel strains were measured by 200 strain-gauges, distributed among the stay cable srands and the reinforcing bars of the deck sections nd support tower basement. For movement measurements, mechanical and optical tools were utilized. Thermal changes were checked up by means of 113 solid state gauges distributed among stay cables, deck sections and central support tower.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076386
  • Published on:
    22/02/2019
  • Last updated on:
    22/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine