0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Instrumentación del puente Fernando Reig sobre el río Barxell (1)

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch, Spanisch
Veröffentlicht in: Hormigón y acero, , n. 169, v. 39
Seite(n): 45-54
Abstrakt:

"Fernando Reig" bridge instrumentation

Thus oaoer shows the unstrymentation used in the "Fernand oReig" bridge, in Alcoy (Alicante), for monitoring its structure during the building and its subsequent load test. The "Fernando Reig" bridge is a cable stayed structure, largely built from precast concrete. It has a 90 m high central support tower and a total span of 273 m. Controls of movements, strains and temperatures were carried out. Steel strains were measured by 200 strain-gauges, distributed among the stay cable srands and the reinforcing bars of the deck sections nd support tower basement. For movement measurements, mechanical and optical tools were utilized. Thermal changes were checked up by means of 113 solid state gauges distributed among stay cables, deck sections and central support tower.

Verfügbar bei: ACHE - Asociación Española de Ingeniería Estructural

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10076386
  • Veröffentlicht am:
    22.02.2019
  • Geändert am:
    22.02.2019
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine