Inspection interval optimization of aircraft landing gear component based on risk assessment using equivalent initial flaw size distribution method
Author(s): |
Youngjun Lee
(Aero Technology Research Institute, Daegu, Korea)
Jongwoon Park (Aero Technology Research Institute, Daegu, Korea) Dooyoul Lee (Department of Defense Science, Korea National Defense University, Nonsan, Korea) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structural Health Monitoring, January 2022, n. 4, v. 21 |
Page(s): | 147592172110336 |
DOI: | 10.1177/14759217211033625 |
- About this
data sheet - Reference-ID
10627276 - Published on:
05/09/2021 - Last updated on:
20/06/2022