Innovative Accelerated Construction Method for Yushan Bridge
Author(s): |
Wang Chang-jiang
Li Lei Chen Xiang-yang Bai Yu-dong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Bridge Engineering, March 2021, n. 1, v. 174 |
Page(s): | 1-31 |
DOI: | 10.1680/jbren.19.00020 |
- About this
data sheet - Reference-ID
10374841 - Published on:
21/09/2019 - Last updated on:
26/02/2021