Innovative Accelerated Construction Method for Yushan Bridge
Auteur(s): |
Wang Chang-jiang
Li Lei Chen Xiang-yang Bai Yu-dong |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Bridge Engineering, mars 2021, n. 1, v. 174 |
Page(s): | 1-31 |
DOI: | 10.1680/jbren.19.00020 |
- Informations
sur cette fiche - Reference-ID
10374841 - Publié(e) le:
21.09.2019 - Modifié(e) le:
26.02.2021