An incrementally launched ramp for the SAAR Interchange in Bahrain
Author(s): |
Francesco Presta
Joe Turner Kashif Rasheed |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | The Structural Engineer, March 2022, n. 3, v. 100 |
Page(s): | 26-36 |
DOI: | 10.56330/zynx5855 |
Abstract: |
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. A project to widen and improve the two highways included their junction, known as the SAAR Interchange, with an additional grade-separated left-turn ramp designed to link the southbound SKBSH to the eastbound SIBSH. The ramp comprised a 515m long flyover built using the incremental launch method. This paper gives an overview of the detailed design and discusses particular aspects of the construction method employed in greater depth. |
- About this
data sheet - Reference-ID
10762678 - Published on:
23/03/2024 - Last updated on:
23/03/2024