0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

An incrementally launched ramp for the SAAR Interchange in Bahrain

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: The Structural Engineer, , n. 3, v. 100
Page(s): 26-36
DOI: 10.56330/zynx5855
Abstrait:

The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. A project to widen and improve the two highways included their junction, known as the SAAR Interchange, with an additional grade-separated left-turn ramp designed to link the southbound SKBSH to the eastbound SIBSH. The ramp comprised a 515m long flyover built using the incremental launch method. This paper gives an overview of the detailed design and discusses particular aspects of the construction method employed in greater depth.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.56330/zynx5855.
  • Informations
    sur cette fiche
  • Reference-ID
    10762678
  • Publié(e) le:
    23.03.2024
  • Modifié(e) le:
    23.03.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine