Increasing the drill rate of holes and shortening the time required to freeze-in piles using a vibratory steam leader
Author(s): |
M. R. Gokhman
Yu. O. Targulyan D. P. Vysotskii |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Soil Mechanics and Foundation Engineering, May 1986, n. 3, v. 23 |
Page(s): | 103-108 |
DOI: | 10.1007/bf01717841 |
- About this
data sheet - Reference-ID
10203985 - Published on:
11/12/2018 - Last updated on:
11/12/2018