Increasing the drill rate of holes and shortening the time required to freeze-in piles using a vibratory steam leader
Auteur(s): |
M. R. Gokhman
Yu. O. Targulyan D. P. Vysotskii |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Soil Mechanics and Foundation Engineering, mai 1986, n. 3, v. 23 |
Page(s): | 103-108 |
DOI: | 10.1007/bf01717841 |
- Informations
sur cette fiche - Reference-ID
10203985 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018