0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Improving construction productivity: a subcontractor's perspective

Author(s):
Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 3, v. 21
Page(s): 245-260
DOI: 10.1108/ecam-05-2013-0043
Abstract:

Purpose

Surprisingly, given the prominence and front-line role of subcontractors in the construction industry, their perspective is almost completely absent from construction productivity literature. Existing research in this area presents a highly one-sided principal contractor perspective and there are very few insights into what subcontractors think. The purpose of this paper is to address the imbalance by investigating the determinants of construction productivity from a subcontractor's perspective.

Design/methodology/approach

Focus groups with 71 of Australia's leading tier-one subcontractors were conducted with the aim of exploring their insights into the productivity challenge.

Findings

The findings indicate that the main determinants of productivity for subcontractors are: the quality of relationships with principal contractors; opportunity for early involvement in design; transparent tender practices; growing administration and document control; design management; project management and supervisory skills, particularly in planning, scheduling and coordination; risk management and; industrial relations (IR).

Research limitations/implications

This research was conducted in Australia and similar research needs to be conducted in other countries to cross-reference and validate the results more widely.

Practical implications

In practical terms, a “culture” of productivity improvement will need to be “nurtured” across the business and supply chain if productivity is to be improved. In particular contractors should avoid bid shopping, respect subcontractor IP and talk to subcontractors earlier in a project.

Social implications

By respecting the opinions of subcontractors who employ the vast majority of workers in the construction industry, productivity and employment can be increased.

Originality/value

The focus group results add significantly to a more balanced understanding of what has hitherto been a one-sided principal contractor focused debate.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-05-2013-0043.
  • About this
    data sheet
  • Reference-ID
    10576430
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine