0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Improvement of students problem-solving skills through project execution planning in civil engineering and construction management education

Author(s):


Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 7, v. 26
Page(s): 1437-1454
DOI: 10.1108/ecam-08-2018-0321
Abstract:

Purpose

The purpose of this paper is to improve students’ problem-solving skills in civil engineering and construction management education.

Design/methodology/approach

The design includes structured role-playing as a pedagogical method in 21 project teams with a total of 82 undergraduate students at Chang’an University, China, in a nine-week Building Information Modeling (BIM) capstone course. The methodology is a teaching–learning experiment in a civil engineering education program with a detailed description of the empirical case and assessment instruments. The approach is to train project execution planning in a capstone course by role-playing with a real-world project using the procedures of the BIM Project Execution Planning Guide (PEPG) and process mapping.

Findings

The study finds that students can significantly improve their problem-solving skills through planning and role-specific communication during projects.

Research limitations/implications

The research sample needs to be expanded from senior-level undergraduate students to consider the different backgrounds and motivations of students.

Practical implications

This pedagogy is helpful to educators who are interested in group learning with a real-world project; the procedures of BIM PEPG; self-chosen responsibilities within a capstone course time framework; raising the awareness of the importance of planning; information exchange; and team cooperation.

Originality/value

This paper fulfills an identified need to study how role-playing in information and technology rich environments can be structured.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-08-2018-0321.
  • About this
    data sheet
  • Reference-ID
    10576746
  • Published on:
    26/02/2021
  • Last updated on:
    26/04/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine