0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Implementation of the observational method in mechanised tunnelling - contracts H3-4 and H8 in the Lower Inn Valley / Umsetzung der Beobachtungsmethode beim TVM-Vortrieb - Projektlose H3-4 und H8 im Unterinntal

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10065738
  • Published on:
    06/10/2011
  • Last updated on:
    09/12/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine