0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Imperfect Information Bargaining Model for Determining Concession Period of PPPs under Revenue Uncertainty

Author(s): ORCID (Ph.D. Student, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia (corresponding author))
(Ph.D. Student, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia.)
(Associate Professor, School of Intelligent Systems Engineering, Sun Yat-Sen Univ., Guangzhou 510275, PR China.)
(Associate Professor, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 12
Page(s): 04520012
DOI: 10.1061/(asce)la.1943-4170.0000382
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000382.
  • About this
    data sheet
  • Reference-ID
    10580011
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine