0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Imperfect Information Bargaining Model for Determining Concession Period of PPPs under Revenue Uncertainty

Auteur(s): ORCID (Ph.D. Student, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia (corresponding author))
(Ph.D. Student, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia.)
(Associate Professor, School of Intelligent Systems Engineering, Sun Yat-Sen Univ., Guangzhou 510275, PR China.)
(Associate Professor, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 12
Page(s): 04520012
DOI: 10.1061/(asce)la.1943-4170.0000382
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)la.1943-4170.0000382.
  • Informations
    sur cette fiche
  • Reference-ID
    10580011
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine