Imperfect Information Bargaining Model for Determining Concession Period of PPPs under Revenue Uncertainty
Auteur(s): |
Hongyu Jin
(Ph.D. Student, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia (corresponding author))
Shijing Liu (Ph.D. Student, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia.) Jun Li (Associate Professor, School of Intelligent Systems Engineering, Sun Yat-Sen Univ., Guangzhou 510275, PR China.) Chunlu Liu (Associate Professor, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, mai 2020, n. 2, v. 12 |
Page(s): | 04520012 |
DOI: | 10.1061/(asce)la.1943-4170.0000382 |
- Informations
sur cette fiche - Reference-ID
10580011 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021