0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Impact of Cost Control Techniques on Cost Overruns in Construction Projects

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10410808
  • Published on:
    06/02/2020
  • Last updated on:
    06/02/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine