Impact of Cost Control Techniques on Cost Overruns in Construction Projects
Author(s): |
S. N. Malkanthi
A. G. D. Premalal R. K. P. C. B. Mudalige |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineer: Journal of the Institution of Engineers, Sri Lanka, October 2017, n. 4, v. 50 |
Page(s): | 53 |
DOI: | 10.4038/engineer.v50i4.7275 |
- About this
data sheet - Reference-ID
10410808 - Published on:
06/02/2020 - Last updated on:
06/02/2020